Demolition is just about complete at the Lake Quivira Passive House. Down to the subfloor and studs, we have a blank canvass that is ready to be transformed into a beautiful high performance home. Watch David Schleicher summarize demolition and explain the next steps in the retrofit process, including window orientation, insulation, and the internal air barrier.